a project portfolio selection model with project interaction & resources interdependency consideration using artificial neural networks

نویسندگان

بهروز دری

دانشیار گروه مدیریت صنعتی دانشکدۀ مدیریت و حسابداری، دانشگاه شهید بهشتی، تهران، ایران بهرنگ اسدی

دانشجوی دکتری مالی دانشکدۀ مدیریت، دانشگاه تهران، تهران، ایران ساسان مظاهری

دانشجوی دکتری مدیریت صنعتی دانشکدة مدیریت، دانشگاه تهران، تهران، ایران

چکیده

a vast number of organizational projects as well as complexity of decision making process can cause particular challenges for project management and its leadership. in order to use organization assets and opportunities efficiently, it is necessary that manager implement a comprehensive multidimensional project portfolio management system that considers economic, social and technical details of the projects. resource constraint compels managers to select operational proposal projects. thus managers can maximize organizational utility due to project portfolio’s resource constraint. this study considers the interactive effects of project portfolio evaluation and sharing organizational project resources with respect to its evaluation and choice of the projects.. in this two-step model, first a branch and bound algorithm with resource interaction was utilized to screen maximal portfolio and, in the next step, each portfolio was evaluated based on artificial neural networks to rank the end project portfolios. also, the ann scores are strongly correlated with the dea and cols efficiency scores.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Portfolio Risk Response Selection Using Bayesian Belief Networks

Risk identification, impact assessment, and response planning constitute three building blocks of project risk management. Correspondingly, three types of interactions could be envisioned between risks, between impacts of several risks on a portfolio component, and between several responses. While the interdependency of risks is a well-recognized issue, the other two types of interactions remai...

متن کامل

Project selection in project portfolio management: An artificial neural network model based on critical success factors

While a growing body of literature focuses in detecting and analyzing the main reasons affecting project success, the use of these results in project portfolio management is still under investigation. Project critical success factors (CSFs) can serve as the fundamental criteria to prevent possible causes of failures with an effective project selection process, taking into account company strate...

متن کامل

Project Portfolio Selection with the Maximization of Net Present Value

Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...

متن کامل

Project selection with limited resources in data envelopment‎ ‎analysis‎

‎In this paper allocating a fixed resource for producing ‎finite projects in order to obtaining a desired level of‎ ‎efficiency will be discussed‎. ‎Note that it is assumed that a ‎vector of limited sources is at hand‎. ‎This vector of resources can‎ ‎be contained human resource‎, ‎budget‎, ‎equipment‎, ‎and facilities‎. ‎In ‎any firm there exist different suggestions from subunits for ‎running...

متن کامل

A MULTI-OBJECTIVE OPTIMIZATION MODEL FOR PROJECT PORTFOLIO SELECTION CONSIDERING AGGREGATE COMPLEXITY: A CASE STUDY

Existing project selection models do not consider the complexity of projects as a selection criterion, while their complexity may prolong the project duration and even result in its failure. In addition, existing models cannot formulate the aggregate complexity of the selected projects. The aggregated complexity is not always equal to summation of complexity of projects because of possible syne...

متن کامل

Project Time and Cost Forecasting using Monte Carlo simulation and Artificial Neural Networks

The aim of this study is to present a new method to predict project time and cost under uncertainty. Assuming that what happens in projects implementation which is expressed in the form of Earned Value Management (EVM) indicators is primarily related to the nature of randomness or unreliability, in this study, by using Monte Carlo simulation, and assuming a specific distribution for the time an...

متن کامل

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023