selection of organizational strategic projects via gpd method (case study: mapna group)

نویسندگان

ناصر حمیدی

دانشیار گروه مدیریت صنعتی، دانشکدۀ مدیریت، دانشگاه آزاد اسلامی، قزوین، ایران محمدعلی والافر

کارشناس ارشد مدیریت اجرایی، دانشکدۀ مدیریت، دانشگاه آزاد اسلامی، قزوین، ایران

چکیده

this prioritization of the projects in the organization is a multi-criteria decision making (mcdm) that because of the uncertainties existing in experts judgments, these cannot be represented accurately with numbers. the scope of this research is the introduction of the grey system theory (grey possibility degree method) and application in ranking strategic organizational projects in an uncertain environment. first, qualitative indicators, which were extracted from the company’s strategic documents (strategic indicators), are weighted using grey verbal variables. subsequently, the effect of each indicator on the projects was investigated. after that, using the gpd algorithm, the projects under study were ranked by looking at the probability of how close each choice was to the preferred choice. based on the probabilities found from studying each project, the choice that was closest to the preferred choice was ranked higher and using the above method, have been judged by the company executives as logical and acceptable.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Organizational Learning via Case Studies in Software Projects

An approach employing case studies for gaining knowledge within software migration projects is presented. First the empirical method case study is defined and later compared to the method of post mortem analysis. We then apply the case study method to the domain of migrating software and discuss the advantages within the context of two industrial case studies conducted with partners. These two ...

متن کامل

Implementing Citizen-Centric Strategic IS Projects: An Indian Case Study

In this paper, we report on the implementation of a public information systems (IS) project in Bangalore, India. Our analysis of the Bangalore One (B1) project demonstrates the deployment of both formal and informal control mechanisms at different stages of the project. The use of informal control mechanisms to establish control over several crucial processes serves to highlight the contextual ...

متن کامل

Prioritizing Organizational Projects with Fuzzy Data Envelopment Analysis Approach (Case Study of Educational Research Plans)

The right choice of research projects is one of the most important effective ways to increase the productivity of research projects and allocate the resources appropriately. Training and education is one of the most important institutions for educating the students and prosperous people of the country. Due to the limited resources of this organization and, on the other hand, the expansion of sc...

متن کامل

Strategic Evaluation of Sustainable Projects based on Hybrid Group Decision Analysis with Incomplete Information

– Sustainable evaluation of construction projects in strategy-focused condition is the main issue for municipalities to appropriately improve public sector services. In this respect, the group decision-making methods could help experts to select suitable sustainable projects and to schedule them regarding their ranking results. Therefore, the objective of this study is to present a hybrid group...

متن کامل

Organizational Indicators for CASE Tools Selection: A Case Study

It is known that the selection, acquisition and implementation process of a CASE (Computer Aided Software Engineering) tool in an organization is a complex process. Fundamentally the impact of a tool is not simply the product of its inherent properties but also depends on the nature of the Information Systems (IS) development process and the organization thereof. Based on: (a) the foregoing and...

متن کامل

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023