the economic lot scheduling problem in flow lines with sequence-dependent setups
نویسندگان
چکیده
the problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. in this paper we present a new mixed integer non linear program (minlp) and a heuristic method to solve the problem in sequence dependent case. furthermore, a genetic algorithm has been developed which applies this constructive heuristic to generate initial population. these two proposed solution methods are compared on randomly generated problems. computational results show a clear superiority of our proposed ga for majority of the test problems.
منابع مشابه
The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups
The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملThe Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups
The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic meth...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملThe Finite Horizon Economic Lot Scheduling in Flexible Flow Lines
This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...
متن کاملAn efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups
This paper presents a novel mathematical programming approach to the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and setup costs. The approach is partly based on the earlier work of Haase and Kimms [2000. Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. International Journal of ...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
international journal of industrial engineering and productional research-جلد ۲۰، شماره ۱، صفحات ۱-۱۰
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023