phase ii logistic profile monitoring
نویسندگان
چکیده
in many industrial and non-industrial applications the quality of a process or product is characterized by a relationship between a response variable and one or more explanatory variables. this relationship is referred to as profile. in the past decade, profile monitoring has been extensively studied under the normal response variable, but it has paid a little attention to the profile with the non-normal response variable. in this paper, the focus is especially on the binary response followed by the bernoulli distribution due to its application in many fields of science and engineering. some methods have been suggested to monitor such profiles in phase i, the modeling phase however, no method has been proposed for monitoring them in phase ii, the detecting phase. in this paper, two methods are proposed for phase ii logistic profile monitoring. the first method is a combination of two exponentially weighted moving average (ewma) control charts for mean and variance monitoring of the residuals defined in logistic regression models and the second method is a multivariate t2 chart to monitor model parameters. the simulation study is done to investigate the performance of the methods.
منابع مشابه
Phase II logistic profile monitoring
In many industrial and non-industrial applications the quality of a process or product is characterized by a relationship between a response variable and one or more explanatory variables. This relationship is referred to as profile. In the past decade, profile monitoring has been extensively studied under the normal response variable, but it has paid a little attention to the profile with the ...
متن کاملPhase II Monitoring of Logistic Regression Profile in Two - stage processes
In most of advanced processes, quality of a final product depends on the several quality characteristic in the previous stages. This is called a cascade property in multi-stage processes. On the other hand, sometimes the quality of a process or product is characterized by a relationship between a response variable and one or more explanatory variable(s).This relation is called profile. In some ...
متن کاملRobust economic-statistical design of the EWMA-R control charts for phase II linear profile monitoring
Control charts are powerful tools to monitor quality characteristics of services or production processes. However, in some processes, the performance of process or product cannot be controlled by monitoring a characteristic; instead, they require to be controlled by a function that usually refers as a profile. This study suggests employing exponentially weighted moving average (EWMA) and range ...
متن کاملEconomic and Economic-Statistical Designs of Phase II Profile Monitoring
In economic design of profiles, parameters of a profile are determined such that the total implementation cost is minimized. These parameters consist of the number of set points, n, the interval between two successive sampling, h, and the parameters of a control chart used for monitoring. In this paper, the Lorenzen-Vance cost function is extended to model the costs associated with implementing...
متن کاملPhase-II Monitoring of AR (1) Autocorrelated Polynomial Profiles
In some statistical process control applications, quality of a process or product can be characterized by a relationship between a response and one or more independent variables, which is typically referred to a profile. In this paper, polynomial profiles are considered to monitor processes in which there is a first order autoregressive relation between the error terms in each profile. A remedi...
متن کاملphase ii nonparametric profile monitoring and decision making on process quality via a mixed model
in many statistical process control applications, the quality of a process is characterized by a profile. a profile is a function in terms of one or more explanatory variables. in profile monitoring, one is interested to monitor the performance of a process or product using this functional relationship. control charts for monitoring nonparametric profiles are useful when the relationship is too...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
international journal of industrial engineering and productional research-جلد ۲۳، شماره ۴، صفحات ۲۹۱-۲۹۹
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023