potential application of gis to layout of construction temporary facilitie
نویسندگان
چکیده
geographic information systems (gis) are one of the fastest growing computer-based technologies of past two decades, yet, full potential of this technology in construction has not been realized. based upon gis capabilities, construction site layout is one of the areas that gis could be applied. the layout of temporary facilities (tfs) such as warehouses, fabrication shops, maintenance shops, concrete batch plants, construction equipments, and residence facilities has an important impact on the cost savings and efficiency of construction operations, especially for large projects. the primary objectives of this paper are to describe gis technology and to present application of gis technology to construction site layout. the study also delineated the methods of location tfs in construction site. an example application of gis to location optimization of tower crane and concrete batch plant is provided to demonstrate gis capabilities as compared with previous models. the spatial and nonspatial data which used in construction site layout process are analyzed and arranged on gis environment and results showed the gis can solve site layout problem. finally, areas of additional research are noted.
منابع مشابه
construction and validation of translation metacognitive strategy questionnaire and its application to translation quality
like any other learning activity, translation is a problem solving activity which involves executing parallel cognitive processes. the ability to think about these higher processes, plan, organize, monitor and evaluate the most influential executive cognitive processes is what flavell (1975) called “metacognition” which encompasses raising awareness of mental processes as well as using effectiv...
application and construction of carbon paste modified electrodes developed for determination of metal ions in some real samples
ساخت الکترودهاِی اصلاح شده ِیکِی از چالشهاِی همِیشگِی در دانش شیمِی بوِیژه شیمِی تجزیه مِی باشد ،که با در نظر گرفتن سادگِی ساخت، کاربردی بودن و ارزان بودن روش مِی توان به باارزش بودن چنِین سنسورهاِی پِی برد.آنچه که در ادامه آورده شده به ساخت و کاربرد الکترودهاِی اصلاح شده با استفاده از نانو ذرات در اندازه گِیرِی ولتامترِی آهن وکادمِیم اشاره دارد. کار اول اختصاص دارد به ساخت الکترود خمِیر کربن اصلاح شده با لِیگاند داِ...
15 صفحه اولApplication of Fuzzy Decision-Making to Facility Layout Planning
This research proposes a vigorous methodology based on the fuzzy set theory to improve the facility layout process. Using natural language, the fuzzy set theory is an appropriate tool for controlling complex systems such as facility planning. The closeness rating between departments in a plant depends on qualitative and quantitative factors. Some of these factors may have a greater effect on th...
متن کاملApplication of Fuzzy Decision-Making to Facility Layout Planning
This research proposes a vigorous methodology based on the fuzzy set theory to improve the facility layout process. Using natural language, the fuzzy set theory is an appropriate tool for controlling complex systems such as facility planning. The closeness rating between departments in a plant depends on qualitative and quantitative factors. Some of these factors may have a greater effect on th...
متن کاملa study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولapplication of brand personality scale in automobile industry: the study of samand’s brand personality dimensions
این تحقیق شخصیت برند سمند را در ایران با استفاده از مدل پنج بعدی آکر (1997) بعنوان یک چهارچوب بطور توصیفی سنجیده است. بنابر این چهارچوب که دراصل در 42 جزء (42 ویزگی شخصیتی) ودر پنج بعد شخصیتی طراحی شده بود ودر کشورها وصنایع مختلف آزموده شده بود, پرسنامه به زبان فارسی ترجمه شده و با استفاده از روشهای ترجمه معکوس و مصاحبه عمیق با 12 متخصص ایرانی به 38 جزء کاهش یافت. و نظرسنجی ای در پنج نمایندگی ا...
15 صفحه اولمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
international journal of civil engineeringجلد ۶، شماره ۴، صفحات ۲۳۵-۲۹۲
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023