Workload assessment on foundry SME to enhance productivity using full time equivalent

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Service Navigator – a SME perspective on productivity management of services

The article describes the concept and the realization of the " Service Navigator " , which enables especially SMEs to evaluate the productivity of their services in a long-term perspective and to manage them systematically. 1. Introduction Despite the wide attention that has been given service productivity in research and practice, it should be noted that so far there are no comprehensive and w...

متن کامل

Malmquist Productivity Index Based on Time Effect

In recent years, measuring and analyzing productivity changes is the main focus of variousresearches who study performance of organizations. All through widespread application ofMalmquist Productivity Index, different types of data should be considered thoroughly,otherwise any defective study of the related data and deciding factors may yield poor results.Practical Malmquist Productivity Index ...

متن کامل

Rerouting carbon flux to enhance photosynthetic productivity.

The bioindustrial production of fuels, chemicals, and therapeutics typically relies upon carbohydrate inputs derived from agricultural plants, resulting in the entanglement of food and chemical commodity markets. We demonstrate the efficient production of sucrose from a cyanobacterial species, Synechococcus elongatus, heterologously expressing a symporter of protons and sucrose (cscB). cscB-exp...

متن کامل

Lost productivity among full-time workers with mental disorders.

BACKGROUND: Few studies have systematically compared the relationship between lost work productivity (work impairment) and mental disorders using population surveys. AIMS: (1) To identify the importance of individual mental disorders and disorder co-occurrences (comorbidity) as predictors of two measures of work impairment over the past month - work loss (number of days unable to perform usual ...

متن کامل

on the equivalence of constructed-response and multiple-choice : stem-equivalent, stem non-equivalent but content equivalent, and stem and content non-equivalent items in reading comprehension using multifaceted rasch

the present study investigated construct equivalence of multiple choice (mc) and constructed response (cr) item types across stem and content equivalent mc and cr items (item type ‘a’), non-stem-equivalent but content equivalent mc and cr items (item type ‘b’), and non-stem and non-content equivalent mc and cr items (item type ‘c’). one hundred seventy english-major undergraduates completed mc ...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: MATEC Web of Conferences

سال: 2018

ISSN: 2261-236X

DOI: 10.1051/matecconf/201815401081