Wind Turbine Maintenance Optimisation: Principles of Quantitative Maintenance Optimisation

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimisation of maintenance routing and scheduling for offshore wind farms

An optimisation model and a solution method for maintenance routing and scheduling at offshore wind farms are proposed. The model finds the optimal schedule for maintaining the turbines and the optimal routes for the crew transfer vessels to service the turbines along with the number of technicians required for each vessel. The model takes into account multiple vessels, multiple periods (days),...

متن کامل

Multi-objective optimisation of asset maintenance management

Asset managers are faced with the necessity to reduce total life-cycle costs of their facilities as well as to improve their physical condition and long-term performance while considering the relative consequences of their failure. This paper presents a systematic decision-making approach for asset maintenance management that combines a stochastic Markovian performance prediction model with a m...

متن کامل

Markov Decision Processes for Road Maintenance Optimisation

This paper primarily focuses on finding a policy for maintaining a road segment. The paper presents two methods for finding such a policy. The first one is using a probabilistic Markov Decision Process in order to determine the optimal maintenance policy. The second method is used by the Road and Hydraulic Engineering Division (DWW). That policy however is not optimal but does not require an MD...

متن کامل

Heuristic based track maintenance scheduling optimisation

The maintenance of railway track is highly relevant for the service quality and safety. This task demands huge technical and human resources. Therefore an optimal deployment of the available resources is crusial for the cost-effectiveness of railway operation. Furthermore, the track geometry maintenance activities need to be planned up to two years in advance. For this reason the French railway...

متن کامل

A reliability-based maintenance technicians’ workloads optimisation model with stochastic consideration

The growing interest in technicians’ workloads research is probably associated with the recent surge in competition. This was prompted by unprecedented technological development that triggers changes in customer tastes and preferences for industrial goods. In a quest for business improvement, this worldwide intense competition in industries has stimulated theories and practical frameworks that ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Wind Engineering

سال: 2007

ISSN: 0309-524X,2048-402X

DOI: 10.1260/030952407781494467