When is a subsea anchor required for a short pipeline/SCR system?

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Economic-Statistical Design of a Control Chart for High Yield Processes When the Inspection is Imperfect

CCC-r control chart is a monitoring technique for high yield processes. It is based on the analysis of the number of inspected items until observing a specific number of defective items.  One of the assumptions in implementing CCC-r chart that has a significant effect on the design of the control chart is that the inspection is perfect. However, in reality, due to the multiple reasons, the...

متن کامل

Substernal Goiter: When is a Sternotomy Required?

The presence of substernal goiter is, per se, an indication for surgical management. Surgical approach of substernal goiter can most commonly be performed using the cervical access, but at times, a sternotomy or thoracotomy is necessary. The aim of this study was to identify the preoperative predictors of a sternotomy in the management of substernal goiter in order to provide better preoperativ...

متن کامل

Dynamic study of a subsea processing system

This paper describes the simulation setup applied in an introductory study in connection with implementation of subsea processing equipment at an already operating gas and oil field. The primary aim of the subsea processing equipment is to increase the oil recovery, but it is also considered as an important technological step forward. A subsea separation and boosting station is planned installe...

متن کامل

a study on rate making and required reserves determination in reinsurance market: a simulation

reinsurance is widely recognized as an important instrument in the capital management of an insurance company as well as its risk management tool. this thesis is intended to determine premium rates for different types of reinsurance policies. also, given the fact that the reinsurance coverage of every company depends upon its reserves, so different types of reserves and the method of their calc...

Yeast Gaalp Is Required for Attachment of a Completed GPI Anchor onto Proteins

Anchoring of proteins to membranes by glycosylphosphatidylinositols (GPIs) is ubiquitous among all eukaryotes and heavily used by parasitic protozoa. GPI is synthesized and transferred en bloc to form GPI-anchored proteins. The key enzyme in this process is a putative GPI:protein transamidase that would cleave a peptide bond near the COOH terminus of the protein and attach the GPI by an amide l...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Pressure Vessels and Piping

سال: 2019

ISSN: 0308-0161

DOI: 10.1016/j.ijpvp.2019.02.009