What Causes Cost Overrun in Transport Infrastructure Projects?

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Inclusion of Health in Environmental Impact Assessment of Major Transport Infrastructure Projects in Vietnam

Background Infrastructure spending, especially in the transport sector, is expected to increase rapidly in Vietnam. This boost in transportation investment impacts health. Environmental impact assessments (EIAs) are essential tools for decision-making to reduce and mitigate anticipated impacts of development projects, and integration of health assessment as an essential part of the EIA process ...

متن کامل

Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis

Background Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considere...

متن کامل

Delays and Cost Overruns in Infrastructure Projects: An Enquiry into Extents, Causes and Remedies

Media reports abound on instances of prolonged delays and excessive cost overruns in infrastructure projects. Only a small number of projects get delivered in time and within the budget. Examples of successful project implementation, like construction of the Delhi Metro Rail, are few and appear only far in between. Indeed, the problem of time and cost overruns in India is widespread and severe....

متن کامل

Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects

Nowadays projects are more complicated involving huge contract values, participants from multi-discipline, more specialized works, tighter schedule, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that plays significant role in a project success. The study focuses on multiple Design and Build (D&B) project which has complicated risk and is governed by fixe...

متن کامل

Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks

Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transport Reviews

سال: 2004

ISSN: 0144-1647,1464-5327

DOI: 10.1080/0144164032000080494a