Weighted completion time minimization on a single-machine with a fixed non-availability interval: Differential approximability

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Approximation algorithm for the weighted flow-time minimization on a single machine with a fixed non-availability interval

In this article, we consider the non-resumable case of the single machine scheduling problem with a fixed non-availability interval. We aim to minimize the weighted sum of completion times. No polynomial 2-approximation algorithm for this problem has been previously known. We propose a 2-approximation algorithm with O(n) time complexity where n is the number of jobs. We show that this bound is ...

متن کامل

Single machine scheduling problem with interval processing times to minimize mean weighted completion time

The single resource scheduling problem is commonly applicable in practice not only when there is a single resource but also in some multiple-resource production systems where only one of the resources is bottle neck. Thus, the single resource (machine) scheduling problem has been widely addressed in the scheduling literature. In this paper, the single machine scheduling problem with uncertain a...

متن کامل

A New Branch-and-Bound for the Problem of Mean Completion Time for the Single Machine with Release Time

Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...

متن کامل

Approximability of total weighted completion time with resource consuming jobs

In this paper we study an extension of the single machine scheduling problem with the total weighted completion time objective, where there is a single non-renewable resource consumed by the jobs, having an initial stock and some additional replenishments over time. We prove that this problem is NP-hard in the strong sense, and provide an FPTAS for a special case with two supply dates.

متن کامل

Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence

This paper addresses scheduling n jobs in a two-machine flow shop to minimize the total completion time, subject to the condition that the jobs are processed in the same given sequence on both machines. A new concept of optimal schedule block is introduced, and polynomial time dynamic programming algorithms employing this concept are derived for two specific problems. In the first problem, the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Discrete Optimization

سال: 2013

ISSN: 1572-5286

DOI: 10.1016/j.disopt.2012.11.002