This paper presents a methodological approach for routing optimization in open pit mines which is trending topic dust emission reduction mining process. In this context, the aim of research and its contribution to knowledge firstly described based on comprehensive literature survey field. Then, as an arc problem, mathematical model process generated including objective function, minimizing total distance traveled by water truck fleets, practical constraints that should be met used assumptions. Finally, formulated problem solved employing General Algebraic Modelling System (GAMS) respect nature equations. The tested results simulations discussed confirm effectiveness proposed method dealing with in-hand problem. could other similar engineering well.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of a goal programming model for optimization of truck allocation in open pit mines

Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...

متن کامل

An Approach to Locate an in Pit Crusher in Open Pit Mines

Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....

متن کامل

Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...

متن کامل

Determination of the largest pit with the non-negative net profit in the open pit mines

The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...

متن کامل

Open pit limit optimization using dijkstra’s algorithm

In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Communications in computer and information science

سال: 2021

ISSN: ['1865-0937', '1865-0929']

DOI: https://doi.org/10.1007/978-3-030-89743-7_14