منابع مشابه
Construction waste management in India
The management of construction waste is important today. The scarcity in the availability of aggregate for the production of concrete is one of the important problems facing by the construction industry. Appropriate use of the construction waste is a solution to the fast degradation of virgin raw materials in the construction industry. This paper enlightens the importance of reduce, reuse and r...
متن کاملManagement of construction and demolition waste.
Waste materials are common problem in modern living. Waste accumulates from number of sources including domestic, industrial, commercial, construction and demolition activity. A significant portion of municipality waste is construction related. Proper management of construction and demolition waste is important or else it will get mixed with municipal waste. This type of mixing leads to cutting...
متن کاملA Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site
Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated wi...
متن کاملSensing methods in civil engineering for an efficient construction management
Sensing methods including Non-destructive testing and monitoring techniques are fundamental tools for performing an efficient condition management system for structures in service. They can on one hand support regular visual inspections and help on the other side to assess the actual condition and performance of a building. These methods provide reliable data for the stakeholders to estimate th...
متن کاملBIM functions for optimized construction management in civil engineering
Purpose The aim of this study is to suggest configuration methodologies of active building information model (BIM) functions that enable to practically control limitations by optimizing schedule overlapping linked to its space models after analyzing workspace conflict analysis for a bridge model. This study also suggests development methodologies of active BIM-functions, linking an optimized me...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: ITEGAM- Journal of Engineering and Technology for Industrial Applications (ITEGAM-JETIA)
سال: 2018
ISSN: 2447-0228
DOI: 10.5935/2447-0228.20180094