VIV of flexible structures in 2D uniform flow
نویسندگان
چکیده
منابع مشابه
Transport of flexible chiral objects in a uniform shear flow
The transport of slightly deformable chiral objects in a uniform shear flow is investigated. Depending on the equilibrium configuration one finds up to four different asymptotic states that can be distinguished by lateral drift velocity of their center of mass, rotational motion about the center of mass and deformations of the object. These deformations influence the magnitudes of the principal...
متن کاملFlexible flow shop scheduling with uniform parallel machines
We consider the multistage flexible flow shop scheduling problem with uniform parallel machines in each stage and the objective of minimizing makespan. We develop a general class of heuristics for this strongly NP-hard problem that extend several well-known heuristics for the corresponding embedded serial flow shop problem, and obtain absolute performance guarantees for heuristics in this class...
متن کاملDetermining the Hydro-acoustic Characteristics of the Ship Propeller in Uniform and Non-uniform Flow
This research has been carried out to determine the marine propeller hydro-acoustic characteristics by Reynolds-Averaged Navier-Stokes (RANS) solver in both uniform and non-uniform wake flow at different operating conditions Wake flow can cause changes in pressure fluctuation and gas effect on propeller noise spectrum. Noise is generated by the induced trailing vortex wake and induced pressure ...
متن کاملBatch Scheduling in Flexible Flow Shop
In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...
متن کاملBatch Scheduling in Flexible Flow Shop
In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Engineering Science
سال: 2020
ISSN: 0020-7225
DOI: 10.1016/j.ijengsci.2019.103211