Vision and Status of the Critical Path Initiative
نویسندگان
چکیده
منابع مشابه
the relationship between learners critical thinking ability and their performance in the reading sections of the tofel and ielts test
the study reflected in this thesis aims at finding out relationships between critical thinking (ct), and the reading sections of tofel and ielts tests. the study tries to find any relationships between the ct ability of students and their performance on reading tests of tofel and academic ielts. however, no research has ever been conducted to investigate the relationship between ct and the read...
15 صفحه اولefl students gender and socioeconomic status: the use of politeness strategies in the first and second languages
within the components of communicative competence, a special emphasis is put on the “rules of politeness,” specifically the politeness strategies (brown and levinson, 1978) that speakers deploy when performing the request speech act. this is because the degree of imposition that making a request places upon one’s interlocutor(s) has been seen to be influenced by several factors among which, as ...
on the relationship between critical thinking, metacognition and translation quality of literary and economic texts
این مطالعه سعی دارد تا رابطه تفکر انتقادی و مهارت های شناختی را به عنوان دو عنصر مهم روانشناسی شناختی با کیفیت ترجمه متون ادبی و اقتصادی بررسی کند. صد دانشجوی سال آخر ترجمه که در مقطع کارشناسی مشغول به تحصیل هستند برای شرکت در این مطالعه انتخاب شدند و آزمون های تافل تفکر انتقادی و مهارت های شناختی از آنها گرفته شد. آزمون ترجمه ادبی و اقتصادی نیز برای تعیین سطح کیفیت ترجمه گرفته شد. یافته های حا...
the relationship between using language learning strategies, learners’ optimism, educational status, duration of learning and demotivation
with the growth of more humanistic approaches towards teaching foreign languages, more emphasis has been put on learners’ feelings, emotions and individual differences. one of the issues in teaching and learning english as a foreign language is demotivation. the purpose of this study was to investigate the relationship between the components of language learning strategies, optimism, duration o...
15 صفحه اولthe impact of generative learning strategy use on efl learners’ reading achievement and critical thinking
این پژوهش کوشیده است تأثیر به کارگیری راهبردهای زایا را بر پیشرفت و بسندگی در خواندن و درک مطلب و نیز بر تفکر انتقادی زبان آموزان انگلیسی را بررسی کند. در این پژوهش تعداد 46 دانش آموز دختر در مقطع متوسطه اول به صورت تصادفی انتخاب وبه دو گروه تجربی و شاهد با تعداد دانش آموزان مساوی در هر گروه تقسیم شدند. به هر دو گروه سه داستان کوتاه به عنوان موضوع خواندن برای کلاس داده شد. به گروه تجربی درابتدا...
ذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Clinical and Translational Science
سال: 2008
ISSN: 1752-8054,1752-8062
DOI: 10.1111/j.1752-8062.2008.00072.x