Vessel based solutions for subsea site investigations
نویسندگان
چکیده
منابع مشابه
Control Solutions for Subsea Processing and Multiphase Transport
To increase the oil production for the Tordis subsea oilfield located at the Norwegian Continental Shelf, a subsea separation and boosting station will be installed. Most of the water will be injected into a subsea reservoir instead of being transported up to the platform. Several challenges conserning process control need to be addressed before the implementation process, and dynamic simulatio...
متن کاملVision for Subsea Vehicle
Remotely operated vehicles used for inspection and maintenance of subsea installations are guided using visual feedback from several vehicle mounted video cameras. These are augmented by position estimates from a navigation subsystem. A system is described which improves the quality of the video images by real-time video enhancement. The current generation of vehicles are limited in their opera...
متن کاملA Redundant FPGA Based Controller for Subsea Blowout Preventer Stack
A redundant Field Programmable Gate Array (FPGA) based controller for subsea Blowout Preventer (BOP) is presented. Triple modular redundancy technique is used for architecture design, since high reliability is a necessary requirement for subsea BOP control system. A multiprocessor system is developed to enhance reliability of the processors and performance of the system. In addition, the shared...
متن کاملAdvanced Site Solutions for WiMax
Introduction The allure of the WiMax wireless high speed data service is well documented. Significant effort has been invested in developing a spectrally efficient modulation that is rather multipath impervious. Still, the laws of physics dictate that we need to get power from point A to point B that is above the receiver threshold. This requires rigorous RF planning and hardware design. Unlike...
متن کاملModal Reduction Based Tracking Control for Installation of Subsea Equipments
This paper proposes a control strategy for the deep sea installation of wellhead equipments hanged by flow line structures, named risers. A fundamental step of this operation is the positioning of the equipment over the wellhead, which can be costly, time-consuming, and unfeasible in bad weather conditions. The approach taken considers the riser structure an Euler-Bernoulli beam submerged in a ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Preview
سال: 2010
ISSN: 1443-2471,1836-084X
DOI: 10.1071/pvv2010n148p38