Variance Minimization – Relationship between Completion-Time Variance and Waiting-Time Variance

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

New Results on the Completion Time Variance Minimization

A single machine scheduling problem where the objective is to minimize the variance of job completion times is considered. The model is applicable to many environments where it is desirable to provide jobs, customers or computer files, with approximately the same service. It is shown that the problem can be formulated as a problem of maximizing a zeroone quadratic function which is a submodular...

متن کامل

Waiting Time Variance in Polling Systems

In this paper, we develop a general expression for the second moment of waiting time for polling systems with either an exhaustive or gated service policy. We obtain a closed form expression for the second moment of waiting time for the special case of systems with two identical stations. This result is used to show that the behavior of the first two moments can be very different. Specifically,...

متن کامل

Job scheduling methods for reducing waiting time variance

Minimizing Waiting Time Variance (WTV) is a job scheduling problem where we schedule a batch of n jobs, for servicing on a single resource, in such a way that the variance of their waiting times is minimized. Minimizing WTV is a well known scheduling problem, important in providing Quality of Service (QoS) in many industries. Minimizing the variance of job waiting times on computer networks can...

متن کامل

Minimizing Class-Based Completion Time Variance on a single machine

⎯We consider the problem of scheduling a set of simultaneously available jobs on a single machine. The objective is to determine a schedule that minimizes the class-based completion time variance (CB-CTV) of the jobs while reducing the overall CTV is taken as the secondary objective. This non-regular performance measure is closely related to service stability and of practical significance in ma...

متن کامل

A Lower Bound for the Weighted Completion Time Variance Problem

We consider a single machine scheduling problem to minimize the weighted completion time variance. This problem is known to be NP-hard in the strong sense. We propose a lower bound based on splitting of jobs and the Viswanathkumar and Srinivasan procedure and a heuristic. The test on more than 2000 instances shows that this lower bound is very tight.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Journal of the Australian Mathematical Society. Series B. Applied Mathematics

سال: 1996

ISSN: 0334-2700,1839-4078

DOI: 10.1017/s0334270000000503