VARIABLE-RATIO SCHEDULES AS VARIABLE-INTERVAL SCHEDULES WITH LINEAR FEEDBACK LOOPS

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Variable-ratio schedules as variable-interval schedules with linear feedback loops.

The mathematical theory of linear systems has been used successfully to describe responding on variable-interval (VI) schedules. In the simplest extension of the theory to the variable-ratio (VR) case, VR schedules are treated as if they were VI schedules with linear feedback loops. The assumption entailed by this approach, namely, that VR and VI-plus-linear-feedback schedules are equivalent, w...

متن کامل

Pausing under variable-ratio schedules: Interaction of reinforcer magnitude, variable-ratio size, and lowest ratio.

Pigeons pecked a key under two-component multiple variable-ratio schedules that offered 8-s or 2-s access to grain. Postreinforcement pausing and the rates of responding following the pause (run rates) in each component were measured as a function of variable-ratio size and the size of the lowest ratio in the configuration of ratios comprising each schedule. In one group of subjects, variable-r...

متن کامل

The linear system theory's account of behavior maintained by variable-ratio schedules.

The mathematical theory of linear systems, which has been used successfully to describe behavior maintained by variable-interval schedules, is extended to describe behavior maintained by variable-ratio schedules. The result of the analysis is a pair of equations, one of which expresses response rate on a variable-ratio schedule as a function of the mean ratio requirement (n) that the schedule a...

متن کامل

The effects of variable-interval and fixed-interval signal presentation schedules on the auditory evoked response.

Averaged auditory evoked responses to 1000-Hz 20-msec tone bursts were obtained from normal-hearing adults under two different intersignal interval schedules: (1) a fixed-interval schedule with 2-sec intersignal intervals, and (2) a variable-interval schedule of intersignal intervals ranging randomly from 1.0 sec to 4.5 sec with a mean of 2 see. Peak-to-peak amplitudes (N1P~) as well as latenci...

متن کامل

Determinants of pausing under variable-ratio schedules: Reinforcer magnitude, ratio size, and schedule configuration.

Pigeons pecked a key under two-component multiple variable-ratio schedules that offered 8-s or 2-s access to grain. Phase 1 assessed the effects of differences in reinforcer magnitude on postreinforcement pausing, as a function of ratio size. In Phase 2, postreinforcement pausing and the first five interresponse times in each ratio were measured as a function of differences in reinforcer magnit...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Experimental Analysis of Behavior

سال: 1986

ISSN: 0022-5002

DOI: 10.1901/jeab.1986.46-315