منابع مشابه
Concept of Value Engineering in Construction Industry
Nowadays, Value engineering (V.E.) is considered as a tool of construction management that can help companies to improve their procedures, services and final products regarding the client’s needs, as an end user, with respect to time, cos t and quality. The V.E. process has evolved from previous methods based on the concept of value and functional approach. These methods were pioneered by Lawre...
متن کاملfuzzy decision support system for application of value engineering in construction industry
the use of value engineering (ve) methodology in construction industry has grown significantly, mainly in view of its extensive benefits. the main task in evaluation phase of ve workshop is to assess alternative ideas, proposed for each function. this phase of ve, hence, could be deemed as a multi criteria decision making (mcdm) problem. this paper presents a fuzzy decision support system (dss)...
متن کاملVALUE ENGINEERING ANALYSIS FOR THE EDUCATIONAL BUILDINGS IN EGYPT
General Authority for Educational Buildings (GAEB) in Egypt is responsible for new construction and maintenance of the educational building [1]. According to the Sixth Five- Years Plan in Egypt, the program of educational structures includes new construction of about 2915 schools, with 39.8 thousand classes. Also, maintenance works for buildings about 1250 schools. These works needs a high budg...
متن کاملReverse Engineering In Construction
Recently a great deal of research into construction IT has been completed, and this is ongoing to improve efficiency and quality in the construction sector. The new innovation of 3D laser scanning is aimed at being used to improve the efficiency and quality of construction projects, such as maintenance of buildings or group of buildings that are going to be renovated for new services. The 3D la...
متن کاملRobust Scheduling in Construction Engineering
In construction engineering, a schedule’s input data, which is usually not exactly known in the planning phase, is considered deterministic when generating the schedule. As a result, construction schedules become unreliable and deadlines are often not met. While the optimization of construction schedules with respect to costs and makespan has been a matter of research in the past decades, the o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Indian Journal of Science and Technology
سال: 2015
ISSN: 0974-5645,0974-6846
DOI: 10.17485/ijst/2015/v8i32/87285