Using Metric Distance Ranking Method to Find Intuitionistic Fuzzy Critical Path

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy Critical Path Method Based on Metric Distance Ranking of Fuzzy Numbers

The Critical Path Method (CPM) is a vital tool for the planning and control of complex projects. The successful implementation of CPM requires the availability of a clear determined time duration for each activity. However, in practical situations this requirement is usually hard to fulfill since many of activities will be executed for the first time. Hence, there is always uncertainty about th...

متن کامل

A Study on Fuzzy Critical Path Method Based On Metric Distance Ranking Of Fuzzy Numbers With Conventional Method

In this paper Algorithm is presented to perform critical path method in a fuzzy environment. The trapezoidal fuzzy number given by decision makers or characterized by historical data are utilized to assess the activity time in a project network. The fuzzy shortest path problem thus obtained is compared with conventional method.

متن کامل

Ranking method of trapezoidal intuitionistic fuzzy numbers

In this paper, considers the usage of intuitionistic fuzzy numbers in decision making. The values and ambiguities of the membership degree and the non-membership degree for trapezoidal intuitionistic fuzzy number are defined as well as the value-index and ambiguity-index. The proposed ranking method is easily implemented and has a natural interpretation. 2010 AMS Classification: 47S20, 03E72

متن کامل

A Critical Path Problem Using Intuitionistic Triangular Fuzzy Number

Critical path method is a network based method planned for development and organization of complex project in real world application. In this paper, a new methodology has been made to find the critical path in a directed acyclic graph, whose activity time uncertain. The vague parameters in the network are represented by intuitionistic triangular fuzzy numbers, instead of crisp numbers. A new pr...

متن کامل

Ranking of intuitionistic fuzzy numbers by new distance measure

Ranking of intuitionsitic fuzzy number plays a vital role in decision making and other intuitionistic fuzzy applications. In this paper, we propose a new ranking method of intuitionistic fuzzy number based on distance measure. We first define a distance measure for interval numbers based on Lp metric and further generalize the idea for intuitionistic fuzzy number by forming interval with their ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Applied Mathematics

سال: 2015

ISSN: 1110-757X,1687-0042

DOI: 10.1155/2015/952150