Using GRASP Approach and Path Relinking to Minimize Total Number of Tardy Jobs on a Single Batch Processing Machine

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs

We consider the feasibility model of multi-agent scheduling on a single machine, where each agent’s objective function is to minimize the total weighted number of tardy jobs. We show that the problem is strongly NP-complete in general. When the number of agents is fixed, we first show that the problem can be solved in pseudo-polynomial time for integral weights, and can be solved in polynomial ...

متن کامل

Batch scheduling to minimize the weighted number of tardy jobs

In this paper, we address a single-machine scheduling problem with due dates and batch setup times to minimize the weighted number of tardy jobs. We give a pseudo-polynomial dynamic program and a fully-polynomial approximation scheme for the case where the due dates are uniform within a family. 2007 Elsevier Ltd. All rights reserved.

متن کامل

An improved memetic algorithm to minimize earliness–tardiness on a single batch processing machine

In this research, a single batch processing machine scheduling problem with minimization of total earliness and tardiness as the objective function is investigated.We first formulate the problem as a mixed integer linear programming model. Since the research problem is shown to be NP-hard, an improved memetic algorithmis proposed to efficiently solve the problem. To further enhance the memetic ...

متن کامل

A Survey of Single Machine Scheduling to Minimize Weighted Number of Tardy Jobs

This paper presents a review of single machine scheduling to minimize the weighted number of tardy jobs. The problem involves processing n jobs on a single machine, each having processing time pj and due date dj . The aim is to schedule the jobs to meet their due date. A job is tardy if the completion time of job j is Cj > dj and on-time otherwise. This paper assesses works done to minimize the...

متن کامل

Single-machine scheduling to minimize absolute lateness for a specified number of tardy jobs

We consider the problem of common due-date to of simultaneously available jobs and sequencing them on a that a number of the jobs are tardy. The optimal combination of the common due-date and job sequence that minimizes the total absolute lateness. A simple to achieve this. Effectively three independent procedures : one to the nnT,nn<>1 sequence; a second to the optimal due date and a third to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Industrial and Systems Engineering

سال: 2020

ISSN: 1748-5037,1748-5045

DOI: 10.1504/ijise.2020.10017570