Updating seismic hazard at Parkfield

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Updating Seismic Hazard at Parkfield

The occurrence of the September 28, 2004 Mw=6.0 mainshock at Parkfield, California, has significantly increased the mean and aperiodicity of the series of time intervals between mainshocks in this segment of the San Andreas fault. We use five different statistical distributions as renewal models to fit this new series and to estimate the time-dependent probability of the next Parkfield mainshoc...

متن کامل

Slow deformation and lower seismic hazard at the new madrid seismic zone

Global Positioning System (GPS) measurements across the New Madrid seismic zone (NMSZ) in the central United States show little, if any, motion. These data are consistent with platewide continuous GPS data away from the NMSZ, which show no motion within uncertainties. Both these data and the frequency-magnitude relation for seismicity imply that had the largest shocks in the series of earthquak...

متن کامل

Seismic hazard zoning in Urmia urban area.

 Today, the resiliency of the human centers, especially urban centers against the natural hazards such as earthquakes, is one of the main challenges in the targeted management of urban. One of the effective strategies in the control, containment and prevention of risks from earthquakes is zoning of urban areas in terms of vulnerability. In this regard, the purpose of this study was to determine...

متن کامل

Probabilistic Seismic Hazard Analysis for Ground Shaking

Foreword The purpose of the Delta Risk Management Strategy (DRMS) Initial Technical Framework (ITF) is to guide the analysis of specific technical topics as they relate to assessing potential risks to Delta levees and assets resulting from various potential impacts (e.g., floods, earthquakes, subsidence, and climate change). These ITFs are considered " starting points " for the work that is to ...

متن کامل

Deterministic seismic hazard analysis for Peshawar, Pakistan

Ground motion estimation for a site (34.01 o N, 71.45 o E) located in the Peshawar in terms of Peak Ground Acceleration (PGA) values is conducted. It is carried out with deterministic seismic hazard analysis approach using faults sources within a radius of one hundred kilometers around site. The results of this study indicate that the Main Boundary Thrust located at a distance of twenty nine (2...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Seismology

سال: 2006

ISSN: 1383-4649,1573-157X

DOI: 10.1007/s10950-005-9005-8