Understanding and visualizing schedule deviations in construction projects using fault tree analysis

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Schedule Multiple Highway Construction Projects

The scheduling of numerous construction projects considering several factors is an important challenge faced by construction companies, particularly road builders. Road builders need to make decision to identify the best possible schedule to complete multiple constructions while considering multiple factor such as maximizing profit, reducing risk, and resource constraints among many other factors.

متن کامل

Formal fault tree construction and system safety analysis

Fault Tree Analysis is a traditional deductive safety analysis technique that is applied during the system design stage. However, traditional fault trees often suffer from a lack of formal semantics to check the correctness or consistency of the descriptions. This is especially a problem in safety-critical system analysis. To overcome this limitation, we propose a novel formal fault tree constr...

متن کامل

Probability distribution fitting of schedule overruns in construction projects

The probability of schedule overruns for construction and engineering projects can be ascertained using a ‘best fit’ probability distribution from an empirical distribution. The statistical characteristics of schedule overruns occurring in 276 Australian construction and engineering projects were analysed. Skewness and kurtosis values revealed that schedule overruns are non-Gaussian. Theoretica...

متن کامل

Dynamic Safety Analysis CNG Stations Using Fault Tree Approach and Bayesian Network

Introduction: The safety of CNG stations is important because of their location in urban areas, as well as to prevent accidents and to protect the safety of personnel, property, and environment. An event occurrence analysis with probability updating is the key to dynamic safety analysis. Methods and materials: In this study, the Failure Modes and Effects Analysis (FMEA) technique was used to d...

متن کامل

A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects

The paper presents a computational method to help in automating the generation of time schedules for bridge construction projects. The method is based on the simulation of the construction works, taking into account the available resources and the interdependencies between the individual tasks. The simulation is realized by means of the discrete-event based simulation software originally create...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Engineering, Construction and Architectural Management

سال: 2020

ISSN: 0969-9988

DOI: 10.1108/ecam-01-2020-0058