Uncertain models on railway transportation planning problem
نویسندگان
چکیده
منابع مشابه
A FUZZY MINIMUM RISK MODEL FOR THE RAILWAY TRANSPORTATION PLANNING PROBLEM
The railway transportation planning under the fuzzy environment is investigated in this paper. As a main result, a new modeling method, called minimum risk chance-constrained model, is presented based on the credibility measure. For the convenience ofs olving the mathematical model, the crisp equivalents ofc hance functions are analyzed under the condition that the involved fuzzy parameter...
متن کاملUncertain goal programming models for bicriteria solid transportation problem
This paper investigates an uncertain bicriteria solid transportation problem. The supplies, demands, conveyance capacities, transportation cost and transportation time are regarded as uncertain variables. According to two types of methods to rank the uncertain variables, expected value goal programming model and chance-constrained goal programming model for the bicriteria solid transportation p...
متن کاملa fuzzy minimum risk model for the railway transportation planning problem
the railway transportation planning under the fuzzy environment is investigated in this paper. as a main result, a new modeling method, called minimum risk chance-constrained model, is presented based on the credibility measure. for the convenience ofs olving the mathematical model, the crisp equivalents ofc hance functions are analyzed under the condition that the involved fuzzy parameter...
متن کاملUncertain Programming Model for Solid Transportation Problem
The solid transportation problem is an important extension of the traditional transportation problem. Solid transportation problem with uncertain variables as its parameters is called uncertain solid transportation problem. In this paper, the expected-constrained programming for an uncertain solid transportation problem is given based on uncertainty theory. According to inverse uncertainty dist...
متن کاملA Lagrangian heuristic framework for a real-life integrated planning problem of railway transportation resources
Train path (infrastructure), rolling stock and crew scheduling are three critical planning decisions in railway transportation. These resources are usually planned separately in a sequential process that typically starts from planning (1) train paths and goes further on to (2) rolling stock and (3) train drivers. Such a sequential approach helps to handle the complexity of the planning process ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Mathematical Modelling
سال: 2016
ISSN: 0307-904X
DOI: 10.1016/j.apm.2015.12.016