Un enseignement par projet de la géotechnique
نویسندگان
چکیده
منابع مشابه
Optimisation de la taille de la série: illustration par un cas industriel de sous-traitance mécanique
Reducing costs of manufactured products is one of the key issues of companies. Bar turning companies (mechanical subcontracting companies) are faced with the following dilemma: use a pull strategy or use a push strategy. Instinctively these companies produce more than demand required by customers. This strategy allows them to respond to requests forecasts and reduce their cost of changeover tim...
متن کاملStrangulation de la verge par un anneau chez l’enfant
We report an unprecedented case of an 8-year old child with no particular pathological history presenting, accompanied by his parents, to the Pediatric Emergency Department with strangulation of the penis occurring 5 days earlier. The patient, curiously, had introduced his penis into a ring. The child had hidden the facts for fear and shame with the hope of being able to extract it alone. Given...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Revue Française de Géotechnique
سال: 2006
ISSN: 0181-0529,2493-8653
DOI: 10.1051/geotech/2006115037