Two warehouse inventory model for deteriorating item with exponential demand rate and permissible delay in payment

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Two-warehouse Inventory Model for Deteriorating Items with Permissible Delay under Exponentially Increasing Demand

In this study, a two-warehouse inventory model with exponentially increasing trend in demand involving different deterioration rates under permissible delay in payment has been studied. Here the scheduling period is assumed to be a variable. The objective of this study is to obtain the condition when to rent a warehouse and the retailer's optimal replenishment policy that minimizes the total re...

متن کامل

Two-Warehouse Inventory Model for Deteriorating Items with Time-Dependent Demand and Partial Backlogging Under Inflation

This paper deals with a two-warehouse inventory model for deteriorating items with time dependent demand and partial backlogging under inflation. It is assumed that deterioration of items follows two-parameter Weibull distribution and demand rate varies exponentially with time. Shortages are allowed and partial backlogging depends on waiting time of next replenishment. A numerical example is pr...

متن کامل

An Inventory Model with Variable Demand Rate for Deteriorating Items under Permissible Delay in Payments

A continuous production control inventory model for deteriorating items with variable demand rate is developed. Demand rate is the linear function of time. In this paper we have done all work in the environment of permissible delay of payments. A number of structural properties of the inventory system are studied analytically. We have discussed the minimum total system cost under the condition ...

متن کامل

Model for Weibull Deteriorating Items with Price - Dependent Demand and Shortages under Permissible Delay in Payment

The focus of manufacturing planning and control has gradually expanded from (in-house) production activities towards all manufacturing and logistic activities in the supply chain. Planning of in-house operations is still very important, but the trends towards increased use of outsourcing and mass customisation require that customers and suppliers are able to exchange information frequently to c...

متن کامل

An EOQ Model for a Deteriorating Item with Time Dependent Quadratic Demand and Variable Deterioration under Permissible Delay in Payment

In a recent paper, Khanra, Ghosh and Chaudhuri’s (2011) presented an EOQ model for a deteriorating item with time dependent quadratic demand under permissible delay in payment. Deterioration considered in most of the EOQ models is constant, while in most of the practical cases the deterioration rate increases with time. This work is motivated by Khanra, Ghosh and Chaudhuri’s (2011) paper extend...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: YUJOR

سال: 2017

ISSN: 0354-0243,1820-743X

DOI: 10.2298/yjor150404007k