منابع مشابه
A New Approach to the 2-variable Subnormal Completion Problem
Abstract. We study the Subnormal Completion Problem (SCP) for 2-variable weighted shifts. We use tools and techniques from the theory of truncated moment problems to give a general strategy to solve SCP. We then show that when all quadratic moments are known (equivalently, when the initial segment of weights consists of five independent data points), the natural necessary conditions for the exi...
متن کاملA Subnormal Toeplitz Completion Problem
We give a brief survey of subnormality and hyponormality of Toeplitz operators on the vector-valued Hardy space of the unit circle. We also solve the following subnormal Toeplitz completion problem: Complete the unspecified rational Toeplitz operators (i.e., the unknown entries are rational Toeplitz operators) of the partial block Toeplitz matrix
متن کاملTwo agents single machine scheduling problem with total completion time and total weighted completion time objectives
متن کامل
NP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion time
Baker and Nuttle [1] studied the following single-variable-resource scheduling problem: sequencing n jobs for processing by a single resource to minimize a function of job completion times, when the availability of the resource varies over time. When the objective function to be minimized is the total weighted completion time, Baker and Nuttle conjectured that the problem is NP-hard. We show in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Hokkaido Mathematical Journal
سال: 2003
ISSN: 0385-4035
DOI: 10.14492/hokmj/1350652422