Two-stage stochastic dual dynamic programming for transmission expansion planning with significant renewable generation and N-k criterion

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem

The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...

متن کامل

Generation and Transmission Expansion Planning for Renewable Energy Integration

In recent years the expansion planning problem has become increasingly complex. As expansion planning (sometimes called composite or integrated resource planning) is a non-linear and nonconvex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the problem. The problem has also been split into generation expansion planning (GEP) and transmi...

متن کامل

A Mathematical Model for Multi-Region, Multi-Source, Multi-Period Generation Expansion Planning in Renewable Energy for Country-Wide Generation-Transmission Planning

Environmental pollution and rapid depletion are among the chief concerns about fossil fuels such as oil, gas, and coal. Renewable energy sources do not suffer from such limitations and are considered the best choice to replace fossil fuels. The present study develops a mathematical model for optimal allocation of regional renewable energy to meet a country-wide demand and its other essential as...

متن کامل

Stochastic Security Constrained Transmission and Battery Expansion Planning In Integrated Gas-Electricity Systems Considering High Penetration of Renewable Resources..

In this study, a new model is proposed to solve the problem of transmission and battery expansion planning considering integrated electricity and gas systems. The presented model is a bi-level stochastic planning model, where transmission and battery expansion planning modeling is done on one level, and gas network modeling is done on the other level. Here, the impact of the high penetration of...

متن کامل

Robust Dynamic Transmission and Renewable Generation Expansion Planning: Walking Towards Sustainable Systems

Nowadays, the transition from a conventional generation system to a renewable generation system is one of the most difficult challenges for system operators and companies. There are several reasons: the long-standing impact of investment decisions, the proper integration of renewable sources into the system, the present and future uncertainties, and the convenience to consider an integrated yea...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: CSEE Journal of Power and Energy Systems

سال: 2016

ISSN: 2096-0042

DOI: 10.17775/cseejpes.2016.00003