Two-Stage Robust Security Constrained Unit Commitment Considering the Spatiotemporal Correlation of Uncertainty Prediction Error
نویسندگان
چکیده
منابع مشابه
solution of security constrained unit commitment problem by a new multi-objective optimization method
چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...
Two-stage Robust Unit Commitment Problem
As an energy market transforms from a regulated market to a deregulated one, the demands for a power plant are highly uncertain. In this paper, we study a two-stage robust optimization formulation and provide a tractable solution approach for the problem. The computational experiments show the effectiveness of our approach.
متن کاملSolving Security Constrained Unit Commitment by Particle Swarm Optimization
The issue of unit commitment is one of the most important economic plans in power system. In modern and traditional power systems, in addition to being economical of the planning, the issue of security in unit operation is also of great importance. Hence power system operation confronts units’ participation and input considering network security constrains. The issue of units’ participation is ...
متن کاملReliability-Constrained Unit Commitment Considering Interruptible Load Participation
From the optimization point of view, an optimum solution of the unit commitment problem with reliability constraints can be achieved when all constraints are simultaneously satisfied rather than sequentially or separately satisfying them. Therefore, the reliability constraints need to be appropriately formulated in terms of the conventional unit commitment variables. In this paper, the reli...
متن کاملSecurity Constrained Unit Commitment in the Simultaneous Presence of Demand Response Sources and Electric Vehicles
Due to the ever-growing load, especially peak load, the increase in the capacity of plants is inevitable for the response to this growth. Peak load causes increases in customer costs and vast investments in generating and transmission parts. Therefore, restructuring in the electrical industry, competition in the electrical market and Demand Response Programs (DRPs) are of special importance in ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Access
سال: 2019
ISSN: 2169-3536
DOI: 10.1109/access.2019.2895625