Two-Stage Optimization Model for Life Cycle Maintenance Scheduling of Bridge Infrastructure
نویسندگان
چکیده
منابع مشابه
Using Ant Colony Optimization for Infrastructure Maintenance Scheduling
For the optimal planning of maintenance schedules for infrastructural buildings (bridges, tunnels, etc) in urban road systems not only the budget has to be considered but also the impact on traffic to avoid unnecessary traffic jams. In a current research project we develop an optimization tool for this multiobjective problem based on ant colony optimization. In each iteration, the ants produce ...
متن کاملAn EPQ Model for Product Life Cycle (Maturity Stage) with Deteriorating Items and Shortages
A product life cycle is the life span of a product in which the period begins with the initial product specification and ends with the withdrawal from the market of both the product and its support. A product life cycle can be divided into several stages characterized by the revenue generated by the product. This study investigates inventory control policies in a manufacturing system for a si...
متن کاملEstimation of Bridge Life Cycle Maintenance Costs Using Reliability-based Model
Bridge life cycle maintenance costs can be estimated more accurately if the deteriorating and maintaining process can be simulated objectively. This paper first proposed a reliabilitybased model for prediction of deterioration. The performance of bridge elements was quantified by the reliability index. A stochastic approach was then introduced and the probabilities for what action should be tak...
متن کاملBridge Management System with Integrated Life Cycle Cost Optimization
.................................................................................................................................. iii Table of
متن کاملBi-level Model for Reliability based Maintenance and Job Scheduling
Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Sciences
سال: 2020
ISSN: 2076-3417
DOI: 10.3390/app10248887