Two-Machine Robotic Cell Sequencing under Different Uncertainties

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-machine robotic cell considering different loading and unloading times

In this paper, the researchers have investigated a Concatenated Robot Move (CRM) sequence problem and Minimal Part Set (MPS) schedule problem with different setup times for two-machine robotic cell. They have focused on simultaneous solving of CRM sequence and MPS schedule problems with different loading and unloading times. They have applied a Simulated Annealing (SA) algorithm to provide a go...

متن کامل

two-machine robotic cell considering different loading and unloading times

in this paper, the researchers have investigated a concatenated robot move (crm) sequence problem and minimal part set (mps) schedule problem with different setup times for two-machine robotic cell. they have focused on simultaneous solving of crm sequence and mps schedule problems with different loading and unloading times. they have applied a simulated annealing (sa) algorithm to provide a go...

متن کامل

Scheduling a two-machine robotic cell: A solvable case

The paper deals with the scheduling of a robotic cell in which jobs are processed on two tandem machines. The job transportation between the machines is done by a transportation robot. The robotic cell has limitations on the intermediate space between the machines for storing the work-in-process. What complicates the scheduling problem is that the loading/unloading operation times are non-negli...

متن کامل

Part sequencing in three-machine no-wait robotic cells

A no-wait robotic cell is an automated ow shop in which a robot is used to move the parts from a machine to the next. Parts are not allowed to wait. We analyze the complexity of the part sequencing problem in a robotic cell with three machines, for di erent periodical patterns of robot moves, when the objective is productivity maximization. c © 2000 Elsevier Science B.V. All rights reserved.

متن کامل

A scalarization-based method for multiple part-type scheduling of two-machine robotic systems with non-destructive testing technologies

This paper analyzes the performance of a robotic system with two machines in which machines are configured in a circular layout and produce non-identical parts repetitively. The non-destructive testing (NDT) is performed by a stationary robotic arm located in the center of the circle, or a cluster tool. The robotic arm integrates multiple tasks, mainly the NDT of the part and its transition bet...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Simulation Modelling

سال: 2018

ISSN: 1726-4529

DOI: 10.2507/ijsimm17(2)434