Two-machine flow shop total tardiness scheduling problem with deteriorating jobs

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

A general variable neighborhood search for single-machine total tardiness scheduling problem with step-deteriorating jobs

In this article, we study a single-machine scheduling problem of minimizing the total tardiness for a set of independent jobs. The processing time of a job is modeled as a step function of its starting time and a specific deteriorating date. A mixed integer programming model was applied to the problem and validated. Since the problem is known to be NP-hard, we proposed a heuristic named simple ...

متن کامل

The two - machine flow shop problem with delays and the one - machine total tardiness problem

A partial order on a job set is called consistent, if it has a linear extension which is an optimal solution to the total tardiness problem of the job set. The concept of proper augmentations of consistent partial orders is based on Emmons' well-known dominance theorem. In this paper, we address the question whether the proper augmentation of a consistent partial order always results in a parti...

متن کامل

Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time

This paper considers a two-machine flow shop scheduling problem with deteriorating jobs in which the processing times of jobs are dependent on their starting times in the sequence. The objective is to minimize the weighted sum of makespan and total completion time. To analyse the problem, we propose a mixed integer programming model, and discuss several polynomially solvable special cases. We a...

متن کامل

Makespan Minimization on Three-Machine Flow shop with deteriorating jobs

In this study, we consider a permutation flow shop scheduling problem on a three-machine with deteriorating jobs (a deteriorating job means that the job’s processing time is an increasing function of its starting time) so as to minimize the makespan. We model job deterioration as a function that is proportional to a linear function of time. For some special cases, we prove that the problem can ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Mathematical Modelling

سال: 2012

ISSN: 0307-904X

DOI: 10.1016/j.apm.2011.12.010