Two-machine flow shop scheduling with convex resource consumption functions

نویسندگان

چکیده

Abstract We consider a two-machine flow shop scheduling problem in which the processing time of each operation is inversely proportional to power amount resources consumed by it. The objective minimize sum makespan and total resource consumption cost. show that NP-hard, its constrained version remains so. Then, we develop 1.25- 2-approximation algorithms for version, respectively.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Inverse scheduling: two-machine flow-shop problem

We study an inverse counterpart of the two machine flow-shop scheduling problem that arises in the context of inverse optimization. While in the forward scheduling problem all parameters are given and the objective is to find job sequence(s) for which the value of the makespan is minimum, in the inverse scheduling the exact values of processing times are unknown and they should be selected with...

متن کامل

Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop

This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...

متن کامل

Two-Machine Flow-Shop Scheduling with Job Delivery Coordination

This study considers a class of two-machine flow-shop scheduling problems with job delivery coordination. Both vehicle capacity and transportation times are also investigated. The objective is to minimize the mean arrival time of jobs. Two integer programming models are developed to optimally solve this problem. These two integer programming models are Models 1 and 2. Model 1 adopts the concept...

متن کامل

Resource Speed Optimization for Two-Stage Flow-Shop Scheduling

Multiple resource co-scheduling algorithms and pipelined execution models are becoming increasingly popular, as they better capture the heterogeneous nature of modern architectures. The problem of scheduling tasks composed of multiple stages tied to different resources goes under the name of “flow-shop scheduling”. This problem, studied since the ’50s to optimize production plants, is known to ...

متن کامل

Two-Machine Fuzzy Flow Shop Scheduling Using Black Hole Algorithm

Flow shop scheduling of jobs has always been a popular problem that has found solutions in the number of heuristic and meta-heuristic techniques. In this manuscript, two-machine flow shop scheduling problem has been investigated while optimizing makespan and idle time of machines. Uncertainties in the processing time and set up times of jobs involved are also taken into consideration in the for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Optimization Letters

سال: 2022

ISSN: ['1862-4480', '1862-4472']

DOI: https://doi.org/10.1007/s11590-022-01934-1