Triticum mosaic virus: A Distinct Member of the Family Potyviridae with an Unusually Long Leader Sequence

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Triticum mosaic virus: a distinct member of the family potyviridae with an unusually long leader sequence.

The complete genome sequence of Triticum mosaic virus (TriMV), a member in the family Potyviridae, has been determined to be 10,266 nucleotides (nt) excluding the 3' polyadenylated tail. The genome encodes a large polyprotein of 3,112 amino acids with the "hall-mark proteins" of potyviruses, including a small overlapping gene, PIPO, in the P3 cistron. The genome of TriMV has an unusually long 5...

متن کامل

In Vitro Transcripts of Wild-Type and Fluorescent Protein-Tagged Triticum mosaic virus (Family Potyviridae) are Biologically Active in Wheat.

Triticum mosaic virus (TriMV) (genus Poacevirus, family Potyviridae) is a recently described eriophyid mite-transmitted wheat virus. In vitro RNA transcripts generated from full-length cDNA clones of TriMV proved infectious on wheat. Wheat seedlings inoculated with in vitro transcripts elicited mosaic and mottling symptoms similar to the wild-type virus, and the progeny virus was efficiently tr...

متن کامل

The Triticum Mosaic Virus 5’ Leader Binds to Both eIF4G and eIFiso4G for Translation

We recently identified a remarkably strong (739 nt-long) IRES-like element in the 5' untranslated region (UTR) of Triticum mosaic virus (TriMV, Potyviridae). Here, we define the components of the cap-binding translation initiation complex that are required for TriMV translation. Using bio-layer interferometry and affinity capture of the native translation apparatus, we reveal that the viral tra...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Phytopathology®

سال: 2009

ISSN: 0031-949X,1943-7684

DOI: 10.1094/phyto-99-8-0943