Transportation Risk ANalysis tool for hazardous Substances (TRANS) – A user-friendly, semi-quantitative multi-mode hazmat transport route safety risk estimation methodology for Flanders
نویسندگان
چکیده
منابع مشابه
multi-agent framework for hazardous goods transport risk management
it is difficult to prevent accidents in the transport of hazardous goods, so the development of strategies for managing crisis situations and the optimization of action plans are important. the crisis situation is a continuous event in time when its evolution is unpredictable because it depends on a whole of complex factors resulting from the environment of the crisis. decision making in crisis...
متن کاملA ROUTING METHODOLOGY FOR HAZARDOUS MATERIALS TRANSPORTATION TO REDUCE THE RISK OF ROAD NETWORK
Abstract: The shipments of hazardous materials (HAZMATs) induce various risks to the road network. Today, one of the major considerations of transportation system managers is HAZMATs shipments, due to the increasing demand of these goods (because it is more used in industry, agriculture, medicine, etc.), and the rising number of incidents that are associated to hazardous materials. This paper ...
متن کاملSemi-quantitative risk assessment of health exposure to hazardous chemical agents in a petrochemical plant
Background: Chemical contaminants present in the work environments include gases, vapors, and solid and liquid suspended particles. The number of factories producing chemicals has increased significantly. Each year, new products are introduced into the market. Consequently, the number of employees at risk of exposure to these materials is increased. Hazardous chemicals are used in the petrochem...
متن کاملRisk Assessment for Hazardous Materials Transportation
The assessment of hazardous materials (HazMats) transport risk assumes a fundamental importance, especially in urban areas, in order to identify possible alternative routes and choose among these the route of minimum risk.It is necessary to appropriately integrate risk analysis with planning and transport management to prevent a potential danger being transformed into a real event.In the presen...
متن کاملA New Multi-objective Model for Multi-mode Project Planning with Risk
The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Transportation Research Part D: Transport and Environment
سال: 2010
ISSN: 1361-9209
DOI: 10.1016/j.trd.2010.07.001