Transient Evoked Otoacoustic Emissions and High Risk Register in Neonates
نویسندگان
چکیده
منابع مشابه
Transient Evoked Otoacoustic Emissions and High Risk Register in Neonates
The development and application of otoacoustic emissions in clinical practice marked the beginning of a new era in the field of screening for congenital hearing loss. In particular, transient evoked otoacoustic emissions (TEOAEs) have been widely adopted by many universal hearing screening (UNHS) programs. The test is quick, non-invasive, objective, sensitive, frequency specific, relatively che...
متن کاملThe relationship between ultra-high frequency thresholds and transient evoked otoacoustic emissions in adults with tinnitus
Background: The possible role of cochlear function in tinnitus generation is still a matter of debate. To assess the role of outer hair cell dysfunction in tinnitus and its possible relationship with ultra-high frequency (UHF) hearing sensitivity, transient evoked otoacoustic emissions (TEOAE) and UHF hearing thresholds were investigated in normal hearing individuals with and withou...
متن کاملContralateral Acoustic Effect of Transient Evoked Otoacoustic Emissions in Neonates.
Contralateral acoustic stimulation (CAS) has the effect of reducing the amplitude of transient evoked otoacoustic emissions (TEOAE) of the opposite cochlea. This phenomenon is considered to be mediated via the efferent pathway, from the superior olivary complex through the medial olivocochlear system to the contralateral cochlea. The assessment of this suppressive effect provides an objective a...
متن کاملHigh Frequency Tympanometry (1,000 Hz) for Neonates with Normal and Abnormal Transient Evoked Otoacoustic Emissions
BACKGROUND AND OBJECTIVES This paper aimed at evaluating the characteristics of high-frequency (1,000 Hz) acoustic admittance (ya) for the neonates with transient evoked otoacoustic emissions (TEOAE) as either pass or refer group. SUBJECTS AND METHODS Using a 1,000 Hz probe tone, 297neonates (152 male, 145 female aged 0-104 days old) were evaluated. Tympanometric parameters admittance value a...
متن کاملTransient evoked otoacoustic emissions and pseudohypacusis.
The audiologic diagnosis of pseudohypacusis continues to challenge the clinical audiologist. The introduction of otoacoustic emissions (OAEs) to the test repertoire of the audiologist may prove valuable in the evaluation of pseudohypacusis. This report highlights five cases in which transient evoked otoacoustic emissions (TEOAEs) were used to cross-check the validity of subjective audiologic th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Academic Journal of Pediatrics & Neonatology
سال: 2017
ISSN: 2474-7521
DOI: 10.19080/ajpn.2017.02.555606