Training and Development Costs, Staff Costs and Operational Profitability in Nepalese Commercial Nanks
نویسندگان
چکیده
منابع مشابه
Time, Staff, Problems and Costs
To assess time, staff, problems and costs involved in clinical electrophysiologic studies for documented or suspected tachycardia, 33 consecutive cases were analyzed prospectively. At least seven staff members were used for each study. Insertion of catheters required 24-105 minutes (mean 63 ± 20 minutes). Programmed stimulation required 12-210 minutes (mean 87 ± 38 minutes). Total fluoroscopy t...
متن کاملpatterns and variations in native and non-native interlanguage pragmatic rating: effects of rater training, intercultural proficiency, and self-assessment
although there are studies on pragmatic assessment, to date, literature has been almost silent about native and non-native english raters’ criteria for the assessment of efl learners’ pragmatic performance. focusing on this topic, this study pursued four purposes. the first one was to find criteria for rating the speech acts of apology and refusal in l2 by native and non-native english teachers...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Management Dynamics
سال: 2020
ISSN: 2091-0460
DOI: 10.3126/md.v23i2.35813