Train unit scheduling guided by historic capacity provisions and passenger count surveys
نویسندگان
چکیده
منابع مشابه
Passenger Train Delay Classification
One of the most popular data mining areas, which estimate future trends of data, is classification. This research is dedicated to predict Iranian passenger train delay with high accuracy over Iranian railway network. A hybrid method based on neuro-fuzzy inference system and Two-step clustering is used for this purpose. The results indicate that the hybrid method is superior over the other commo...
متن کاملPassenger Centric Train Timetabling Problem
The aim of this paper is to analyze and to improve the current planning process of the passenger railway service in light of the recent railway market changes. In order to do so, we introduce the Passenger Centric Train Timetabling Problem. The originality of our approach is that we account for the passenger satisfaction in the design of the timetable. We consider both types of timetable(s): cy...
متن کاملConcurrent Locomotive Assignment and Freight Train Scheduling
The locomotive assignment and the freight train scheduling are important problems in railway transportation. Freight cars are coupled to form a freight rake. The freight rake becomes a train when a locomotive is coupled to it. The locomotive assignment problem assigns locomotives to a set of freight rakes in a way that, with minimum locomotive deadheading time, rake coupling delay and locomotiv...
متن کاملPassenger Train Delay Classification The
One of the most popular data mining areas, which estimate future trends of data, is classification. This research is dedicated to predict Iranian passenger train delay with high accuracy over Iranian railway network. A hybrid method based on neuro-fuzzy inference system and Two-step clustering is used for this purpose. The results indicate that the hybrid method is superior over the other commo...
متن کاملA two-phase approach for real-world train unit scheduling
A two-phase approach for the train unit scheduling problem is proposed. The first phase assigns and sequences train trips to train units temporarily ignoring some station infrastructure details. Real-world scenarios such as compatibility among traction types and banned/restricted locations and time allowances for coupling/decoupling are considered. Its solutions would be near-operable. The seco...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Public Transport
سال: 2016
ISSN: 1866-749X,1613-7159
DOI: 10.1007/s12469-016-0138-7