Train rescheduling plan generation based on train route combination considering rolling stock types
نویسندگان
چکیده
منابع مشابه
Heuristic Approach to Train Rescheduling
Starting from the defined network topology and the timetable assigned beforehand, the paper considers a train rescheduling in respond to disturbances that have occurred. Assuming that the train trips are jobs, which require the elements of infrastructure – resources, it was done by the mapping of the initial problem into a special case of job shop scheduling problem. In order to solve the given...
متن کاملEnergy efficiency strategies for rolling stock and train operation
Typical passenger trains have specific weights between 400 and 800 kg per seat, but some high speed trains such as the German ICE 2 have values as high as 1100 kg/seat. Although there are some railway-specific limits to light-weight efforts, such as side wind stability, the Japanese Shinkansen (537 kg per seat) and the Copenhagen suburban trains (360kg per seat) may serve as benchmarks for ligh...
متن کاملA Theory of Distributing Train Rescheduling
Abs t rac t . We outline the formal modelling of a software system to support the scheduling and rescheduling of trains. The current (prototype) system supports only centralized rescheduling, but in practice rescheduling is done on an area basis, and a distributed system is required. Developing a distributed system involves the notions of delegability of functions to adjust schedules and distri...
متن کاملActor-agent application for train driver rescheduling
This paper describes the design, implementation, visualizations, results and lessons learned of a novel real-world socio-technical research system for the purpose of rescheduling train drivers in the event of disruptions. The research system is structured according to the Actor-Agent paradigm: here agents assist in rescheduling tasks of train drivers. Coordination between agents is based on a t...
متن کاملReal-time train driver rescheduling by actor-agent techniques
Passenger railway operations are based on an extensive planning process for generating the timetable, the rolling stock circulation, and the crew duties for train drivers and conductors. In particular, crew scheduling is a complex process. After the planning process has been completed, the plans are carried out in the real-time operations. Preferably, the plans are carried out as scheduled. How...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Transport Development and Integration
سال: 2019
ISSN: 2058-8305,2058-8313
DOI: 10.2495/tdi-v3-n2-117-131