Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm
نویسندگان
چکیده
منابع مشابه
A Fuzzy Simulated Annealing approach for project time-cost tradeoff
Managers often face difficulties when making project decisions that involve large number of interrelated activities – the planning and scheduling of which is project management. Most problems often arise in areas such as product development, production planning and control and setting up the production facilities. One important aspect of project management is activity crashing, i.e. reducing th...
متن کاملMulti-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملtime-cost-quality optimization of broilers production process using integration genetic algorithm and fuzzy logic
one of the most important issues in the management of production is select the best option for each production activity, so that the time and cost of production is minimal and quality is the maximum. considering to the large number of activities and options for each activity, usually, this choice does not have a unique solution and can be used the utility function and assign weights to time, co...
متن کاملEffects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile
This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...
متن کاملUsing fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Alexandria Engineering Journal
سال: 2021
ISSN: 1110-0168
DOI: 10.1016/j.aej.2021.06.058