Towards an end-to-end delay analysis of wireless multihop networks
نویسندگان
چکیده
منابع مشابه
Towards an end-to-end delay analysis of wireless multihop networks
We employ discrete-time queueing theory to analyze the end-to-end (e2e) delay of wireless multihop networks for two MAC schemes, m-phase TDMA and slotted ALOHA. Unlike general two-dimensional networks where there exists sufficient traffic multiplexing that would permit the arrival processes to be approximated as independent, in linear networks with multihop communication, the arrival processes ...
متن کاملUpperbounding End-to-End Throughput of Multihop Wireless Networks
In this paper, we propose efficient algorithms to compute the upperbound of end to end throughput that are both theoretically and practically tight in multihop wireless networks.
متن کاملEnd-to-end energy-bandwidth tradeoff in multihop wireless networks
In this paper, energy-constrained wireless multi-hop networks with a single source-destination pair are considered. A network model that incorporates both the energy radiated by the transmitter and the energy consumed by the circuits that process the signals is proposed. The rate of communication is the number of information bits transmitted (end-to-end) per coded symbol transmitted by any node...
متن کاملAdaptive per hop differentiation for end-to-end delay assurance in multihop wireless networks
As the rapid growth of smart hand-held devices, multihop wireless access networks have a lot of potential applications in a variety of fields in civilian and military environments. Many of these applications, such as realtime audio/video streaming, will require some form of end-to-end QoS assurance. In this paper we present an adaptive per hop differentiation (APHD) scheme towards achieving end...
متن کاملEnd-to-end delay assurances in multihop wireless local area networks
In this paper, we address the problem of providing multiple classes of delay assurances to end-to-end applications in a multihop wireless local area network (WLAN) architecture. Specifically, mobile users form multihop wireless connections towards an access point (AP) for Internet access. In this context, not all users are directly reachable by AP. Users are potentially distributed in an area l...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Ad Hoc Networks
سال: 2009
ISSN: 1570-8705
DOI: 10.1016/j.adhoc.2008.04.010