Towards a Unified Framework for Project Success Score Computation in Construction Projects

نویسندگان

چکیده

The discussion of project success has expanded beyond management and criteria. main cause the failure to evaluate performance in construction projects is absence a shared definition common set criteria for success. aim this paper develop framework which includes certain assess allows calculation Project Success Score (PSS). Rapid Impact Assessment Matrix (RIAM) approach adopted modified appropriately, providing that combines primary secondary compute comprehensive Seventeen (17) are included framework, their corresponding thresholds formulated determine limits project. final PSS consists five distinct classes, range from level absolute (PSS 9361 13,500) (13 384). Finally, web application simulates developed. was tested by an end-user, order its applicability ease use, facilitation whole computation process ensured. This provides rational through can be rapidly assessed, with highlighting potential unsuccessful each increasing probability more effective outcomes.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS

Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...

متن کامل

Project Governance Framework for Mega Construction Projects (MCPs) in China: Lessons from SHITH and SHCBD projects

We analyse governance in two mega construction projects (MCPs): Shanghai Hongqiao Integrated Transportation Hub (SHITH) project and Shanghai Hongqiao central Business district (SHCBD). We suggest that the governance of mega construction projects in China needs the participation of construction headquarter and three coordination platforms, namely, design coordination platform, schedule platform ...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Towards a Unified Framework

Conversational interfaces have received much attention as a promising natural communication channel between humans and computers. A typical conversational interface consists of three major systems: speech understanding, dialog management and spoken language generation. In such a conversational interface, speech recognition as the front-end of speech understanding remains to be one of the fundam...

متن کامل

Project Success in Agile Development Projects

The paper explains and clarifies the differences between Waterfall and Agile development methodologies, establishes what criteria could be taken into account to properly define project success within the scope of software development projects, and finally tries to clarify if project success is the reason why many organizations are moving to Agile methodologies from other ones such as Waterfall....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: CivilEng

سال: 2022

ISSN: ['2673-4109']

DOI: https://doi.org/10.3390/civileng3030045