Towards a conceptual approach to predetermining long-return-period avalanche run-out distances
نویسندگان
چکیده
منابع مشابه
Towards a new conceptual approach to "parasitoproteomics".
Many parasitologists are betting heavily on proteomic studies to explain biochemical host-parasite interactions and, thus, to contribute to disease control. However, many "parasitoproteomic" studies are performed with powerful techniques but without a conceptual approach to determine whether the host genomic responses during a parasite infection represent a nonspecific response that might be in...
متن کاملA non-adiabatic approach to entanglement distribution over long distances
Entanglement distribution between trapped-atom quantum memories, viz. single atoms in optical cavities, is addressed. In most scenarios, the rate of entanglement distribution depends on the efficiency with which the state of traveling single photons can be transferred to trapped atoms. This loading efficiency is analytically studied for two-level, V -level, Λ-level, and double-Λ-level atomic co...
متن کاملThe Risk Return Tradeoff in the Long-Run: 1836-2003
Previous studies typically find a statistically insignificant relationship between the market risk premium and its expected volatility. Further, several of these studies estimate a negative risk return tradeoff contrary to the predictions of mainstream theory. Using simulations, I demonstrate that even 100 years of data constitute a small sample that may easily lead to this finding even though ...
متن کاملThe Time-varying Risk-Return Tradeoff in the Long-Run
Lundblad(2007,JFE) shows that the risk-return tradeoff is unequivocally positive with a two-century history of equity market data. A further examination of the relation with the UK monthly stock returns from 1836 to 2010 produces rather weak risk-return relation. I show that the risk-return relation is mostly positive but varies considerably over time based on a new nonlinear ICAPM with multiva...
متن کاملA Nonlinear Model to Maximize Profit of Hydropower Plants in the Long-Run
The problem of hydropower plant profit maximization includes simultaneous programming of optimal utilization of water resources and participation in the power market. The present research was performed on a chain of hydropower plants within the Karoon river basin in Khuzestan Province (Iran) (i.e. Karoon 3, Karoon 1, and Masjid Soleyman hydropower plants). In this research nonlinear programmi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Glaciology
سال: 2004
ISSN: 0022-1430,1727-5652
DOI: 10.3189/172756504781830178