Toward Reducing Construction Project Delivery Time under Limited Resources

نویسندگان

چکیده

One of the most vital construction project aspects is to complete a in minimum time restricted time–cost trade-off. Overlapping activities’ planning and their impact on under limited resource constraints should be considered. This study aims develop model for optimizing schedule cost regarding overlap activities impacts. reviews previous studies changes past likely produce additional reworking subsequent activities. In addition, an AHP developed assess based possible five realistic projects are applied. Finally, using overlapping techniques by Java program. The results indicate that proposed can used managers easily solving optimization problems. it updated continuously improve its functionality. later support AI finding better solutions.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project selection with limited resources in data envelopment‎ ‎analysis‎

‎In this paper allocating a fixed resource for producing ‎finite projects in order to obtaining a desired level of‎ ‎efficiency will be discussed‎. ‎Note that it is assumed that a ‎vector of limited sources is at hand‎. ‎This vector of resources can‎ ‎be contained human resource‎, ‎budget‎, ‎equipment‎, ‎and facilities‎. ‎In ‎any firm there exist different suggestions from subunits for ‎running...

متن کامل

Classifier evaluation under limited resources

Existing evaluations measures are insufficient when probabilistic classifiers are used for choosing objects to be included in a limited quota. This paper reviews performance measures that suit probabilistic classification and introduce two novel performance measures that can be used effectively for this task. It then investigates when to use each of the measures and what purpose each one of the...

متن کامل

Allocating Time and Resources in Project Management Under Uncertainty

We define and develop a solution approach for planning, scheduling and managing project efforts where there is significant uncertainty in the duration, resource requirements and outcomes of individual tasks. Our approach yields a nonlinear optimization model for allocation of resources and available time to tasks. This formulation represents a significantly different view of project planning fr...

متن کامل

project selection with limited resources in data envelopment‎ ‎analysis‎

‎in this paper allocating a fixed resource for producing ‎finite projects in order to obtaining a desired level of‎ ‎efficiency will be discussed‎. ‎note that it is assumed that a ‎vector of limited sources is at hand‎. ‎this vector of resources can‎ ‎be contained human resource‎, ‎budget‎, ‎equipment‎, ‎and facilities‎. ‎in ‎any firm there exist different suggestions from subunits for ‎running...

متن کامل

Classifier Risk Estimation under Limited Labeling Resources

In this paper we propose strategies for estimating performance of a classifier when labels cannot be obtained for the whole test set. The number of test instances which can be labeled is very small compared to the whole test data size. The goal then is to obtain a precise estimate of classifier performance using as little labeling resource as possible. Specifically, we try to answer, how to sel...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2021

ISSN: ['2071-1050']

DOI: https://doi.org/10.3390/su131911035