Toros Göknarı (Abies cilicica Car.)’nda Yaprak Alan İndeksinin Belirlenmesi: Adana Kozan Yöresi Örneği

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Somatic embryogenesis of the hybrid Abies cilicica × Abies cephalonica

The interspecific hybrid fir Abies cilicica × Abies cephalonica is based on native species Abies cephalonica (Loud.) and Abies cilicica (Ant. et Kotschy) Carr. Many variants of nutrient media have been tested. The medium BAP at a concentration of 1 mg·l–1, 1,000 mg·l–1 myo-inositol, 500 mg·l–1 glutamine, and 1,000 mg·l–1 casein was found to be the most suitable initiation medium for somatic emb...

متن کامل

Kamu İnternet Sitelerinde Yer Alan Arama Alanlarının Kullanılabilirliğinin Belirlenmesi

Özet. Kamu kurumlarının sahip olduğu internet sayfaları ilgili kamu kurumunun sunduğu hizmetlerden yararlanan tüm vatandaşlar tarafından kullanılmaktadır. Kamu kurumlarının internet sitelerinin kullanılabilirliğinden kaynaklanan sorunlar, büyük verimlilik kayıplarına neden olmakta ve vatandaşların aldıkları hizmetin kalitesini düşürmektedir. Bu çalışmada Türkiye’de bulunan 21 Bakanlık internet ...

متن کامل

Genetic Structure and Diversity of the Endangered Fir Tree of Lebanon (Abies cilicica Carr.): Implications for Conservation

The threatened conifer Abies cilicica currently persists in Lebanon in geographically isolated forest patches. The impact of demographic and evolutionary processes on population genetic diversity and structure were assessed using 10 nuclear microsatellite loci. All remnant 15 local populations revealed a low genetic variation but a high recent effective population size. FST -based measures of p...

متن کامل

Yazılım Proje Faktörlerinin Risklerle Etkileşimi: Telekomünikasyon Örneği

Risk management that is one of the knowledge areas of software project management process, has a direct impact on the success of the Project. the success of the project can be estimated in the project first phase by creating a predictive risk model with the risks and results in similar projects. For this purpose, the studies on risk estimation and risk evaluation have started to show increase i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Artvin Çoruh Üniversitesi Orman Fakültesi Dergisi

سال: 2019

ISSN: 2146-1880

DOI: 10.17474/artvinofd.535526