Time to plan for Plan S

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Time to Plan and Aggregate Fluctuations

This article investigates the business cycle implications of the planning phase of business investment projects. Time to plan is built into a Kydland-Prescott time-to-build model, which assumes that investment projects take four periods to complete. In the Kydland-Prescott time-to-build model, resources for these projects flow uniformly across the four periods; in the time-to-plan model, few re...

متن کامل

Knowledge Representation for Real-time Plan Development

The Cooperative Intelligent Real-time Control Architecture employs an integrated planningscheduling system to create plans that guarantee system safety in complex real-time environments. The planner uses state transitions with discrete-valued features to build and schedule plans that maintain system safety while achieving mission goals. The product, a real-time control plan, specifies actions p...

متن کامل

Sufficient Plan-Time Statistics for Decentralized POMDPs

Optimal decentralized decision making in a team of cooperative agents as formalized by decentralized POMDPs is a notoriously hard problem. A major obstacle is that the agents do not have access to a sufficient statistic during execution, which means that they need to base their actions on their histories of observations. A consequence is that even during off-line planning the choice of decision...

متن کامل

Real Time in Plan 9

We describe our experience with the implementation and use of a hardreal-time scheduler for use in Plan 9 as an embedded operating system.

متن کامل

Transferring Route Plan over Time

Travelling salesman problem (TSP) is a combinational optimization problem and solution approaches have been applied many real world problems. Pure TSP assumes the cities to visit are fixed in time and thus solutions are created to find shortest path according to these point. But some of the points are canceled to visit in time. If the problem is not time crucial it is not important to determine...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Nursing Open

سال: 2019

ISSN: 2054-1058,2054-1058

DOI: 10.1002/nop2.263