Time-cost Tradeoff For Optimizing Contractor Npv By Cost Payment And Resource Constraints Using Nsga-ii Algorithm (case Studybandar Abbas Gas Condensate Refinery Project)
نویسندگان
چکیده
منابع مشابه
Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile
This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...
متن کاملDiscrete time-cost tradeoff model for optimizing multi-mode construction project resource allocation
The project scheduling and resource allocation problems have been studied using different optimization methods. The resource leveling problem was proposed to reduce the resource fluctuation and was always studied independently resource constraint problem. For example, resource-constrained project scheduling problem (RCPSP) was proposed to optimize scheduling under resource constraints. This res...
متن کاملhazard evaluation of gas condensate stabilization and dehydration unit of parsian gas refinery using hazop procedures
شناسایی مخاطرات در واحد 400 پالایشگاه گاز پارسیان. در این پروزه با بکارگیری از تکنیک hazop به شناسا یی مخاطرات ، انحرافات ممکن و در صورت لزوم ارایه راهکارهای مناسب جهت افزایش ایمنی فرا یند پرداخته میگردد. شرایط عملیاتی مخاطره آمیز نظیر فشار و دمای بالا و وجود ترکیبات مختلف سمی و قابل انفجار در واحدهای پالایش گاز، ضرورت توجه به موارد ایمنی در این چنین واحدهایی را مشخص می سازد. مطالعه hazop یک ر...
Multi-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملeffects of project uncertainties on nonlinear time-cost tradeoff profile
this study presents the effects of project uncertainties on nonlinear time-cost tradeoff (tct) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ann) models with hybrid meta-heuristic (hmh) technique, abridged as fuzzy-ann-hmh. nonlinear time-cost relationship of project activities is dealt with ann models. ann models are then integrated with ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Mathematics and Computer Science
سال: 2014
ISSN: 2008-949X
DOI: 10.22436/jmcs.012.01.02