TIME BUFFERS IN CONSTRUCTION PROCESS SCHEDULING

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs

This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...

متن کامل

Online Scheduling for Sorting Buffers

We introduce the online scheduling problem for sorting buffers. A service station and a sorting buffer are given. An input sequence of items which are only characterized by a specific attribute has to be processed by the service station which benefits from consecutive items with the same attribute value. The sorting buffer which is a random access buffer with storage capacity for k items can be...

متن کامل

An LP-based Tabu Search for Batch Scheduling in a Cutting Process with Finite Buffers

This paper addresses a cutting stock problem under typical resource constraints that arise when working centres with nesting capabilities are associated with automatic feeders/stackers. The critical resource is the number of buffers available to host the batches built up by the centre. To cope with it, pattern and batch sequencing problems must be addressed simultaneously. A tabu-search algorit...

متن کامل

a hybrid approach for fuzzy just-in-time flow shop scheduling with limited buffers and deteriorating jobs

this paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. the fuzzy set theory is applied to describe this situation. a novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. due to the computational complexities, the prop...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT

سال: 2007

ISSN: 1392-3730,1822-3605

DOI: 10.3846/13923730.2007.9636430