Time-based service constraints for inventory systems with commitment lead time
نویسندگان
چکیده
منابع مشابه
Integrated Inventory Model with Controllable Lead Time Involving Investment for Quality Improvement in Supply Chain System
The purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. This paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...
متن کاملBenefits of Considering Inventory in Service Parts Logistics Network Design Problems with Time-based Service Constraints
We study the integrated logistics network design and inventory stocking problem as characterized by the interdependency of the design and stocking decisions in service parts logistics. These two sets of decisions have been usually considered sequentially in practice, and the associated problems have been tackled separately in the research literature. The overall problem is typically further com...
متن کاملInventory-Location Problems for Spare Parts with Time-Based Service Constraints
This thesis studies an inventory-location problem faced by a large manufacturer and supplier of small to medium sized aircraft and their spare parts. The sale of after market spare parts is a major source of revenue for the company, but it is a complex industry with many unique challenges. The original problem is a multi-echelon network design problem, which is decomposed into a facility locati...
متن کاملComparison of Inventory Systems with Service, Positive Lead-Time, Loss, and Retrial of Customers
We analyze and compare three (s,S) inventory systems with positive service time and retrial of customers. In all of these systems, arrivals of customers form a Poisson process and service times are exponentially distributed. When the inventory level depletes to s due to services, an order of replenishment is placed. The lead-time follows an exponential distribution. In model I, an arriving cust...
متن کاملBenefits of Considering Inventory in Logistics Network Design Problems with Time-based Service Constraints
We study the integrated logistics network design and inventory stocking problem as characterized by the interdependency of the design and stocking decisions in service parts logistics. These two sets of decisions have been usually considered sequentially in practice, and the associated problems have been tackled separately in the research literature. The overall problem is typically further com...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: OR Spectrum
سال: 2020
ISSN: 0171-6468,1436-6304
DOI: 10.1007/s00291-020-00590-0