Time and space multi-manned assembly line balancing problem using genetic algorithm
نویسندگان
چکیده
Purpose: Time and Space assembly line balancing problem (TSALBP) is the of taking area required by task to store tools into consideration. This important be considered minimize unplanned traveling distance workers consequently time waste. Although TSALBP a realistic that express real-life situation, it became more practical consider multi-manned get better space utilization, few literatures addressed in simple only one line. In this paper bi-objective proposedDesign/methodology/approach: Hybrid genetic algorithm under constraints besides conventional used model problem. The initial population generated based on heuristic added random generations. objective number stations.Findings: results showed effectiveness proposed solving method gets Nissan compared literature. It also found there relationship between variability time, maximum cycle solution some features appropriate solve as than line.Originality/value: first article constraint using algorithm. A according it, (one sided or multi-manned) defined.
منابع مشابه
Assembly line balancing problem with skilled and unskilled workers: The advantages of considering multi-manned workstations
This paper address a special class of generalized assembly line balancing in which it is assumed that there are two groups of workers: skilled and unskilled ones. The skilled workers are hired permanently while the unskilled ones can be hired temporarily in order to meet the seasonal demands. It is also assumed that more than one worker may be assigned to each workstation. To show the adv...
متن کاملA cost-oriented model for multi-manned assembly line balancing problem
In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...
متن کاملgenetic algorithms for assembly line balancing problem
there are some machineries and equipments as well as relatively fix amount of human resources involved in any production process. in many cases, by observing operational method of a process, one may see that some of these machineries are not working, but on the other hand, other equipments are continuously working, and many parts are set in front of them, waiting to be set up over machines to c...
متن کاملa cost-oriented model for multi-manned assembly line balancing problem
in many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. this type of assembly line is called multi-manned assembly line (mal). in the classical multi-manned assembly line balancing problem (malbp) the objective is to minimize the manpower needed to manufacture one product unit. apart from the manpower, othe...
متن کاملAn advanced multiobjective genetic algorithm design for the time and space assembly line balancing problem
Time and space assembly line balancing considers realistic multiobjective versions of the classical assembly line balancing industrial problems involving the joint optimization of conflicting criteria such as the cycle time, the number of stations, and/or the area of these stations. In addition to their multi-criteria nature, the different problems included in this field inherit the precedence ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Industrial Engineering and Management
سال: 2021
ISSN: ['2013-8423', '2013-0953']
DOI: https://doi.org/10.3926/jiem.3542