Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Identify blockchain technology strategies in the oil and gas industry

The purpose of the research is to identify blockchain technology strategies in the oil and gas industry. In this research, the mixed research method has been used. In the qualitative part of the research community, there were experts in the field of blockchain technology, 12 of whom were purposefully selected for in-depth interviews. Open and axial coding was used to analyze the data. The stati...

متن کامل

consequence analysis of the leakage, ignition and explosion during high pressure sour gas injection process to the oil reservoir

there is no doubt that human being needs to become integrated with industry and industry needs to be progressed, daily. on the other hand, serious events in industrial units specially in oil industries has been shown that such damages and events are industry related ones. the consequence of such events and damages which resulted in chemical and poisoned explosions and loss of life and property ...

construction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers

the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...

the relationship between learners critical thinking ability and their performance in the reading sections of the tofel and ielts test

the study reflected in this thesis aims at finding out relationships between critical thinking (ct), and the reading sections of tofel and ielts tests. the study tries to find any relationships between the ct ability of students and their performance on reading tests of tofel and academic ielts. however, no research has ever been conducted to investigate the relationship between ct and the read...

15 صفحه اول

Identifying and weighting the main dimensions and components of intrapreneurship in the oil and gas drilling industry

Oil and gas are considered one of the most strategic sources of energy supply in the world, and countries with these resources are trying to increase extraction and production in order to develop leading industries and export it in raw or processed form to increase foreign exchange income and, as a result, economic prosperity for society. Paying attention to the effects of entrepreneurship in o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Buildings

سال: 2019

ISSN: 2075-5309

DOI: 10.3390/buildings9020041